Project report - International
MERO-UK Highlights
12.2020Project report: Helsinki Central Library Oodi
07.2020The opening of the new and spectacularly designed Helsinki Central Library Oodi created worldwide headlines. Our finnish partner FINNDATA helped to secure the grand opening date by using a...
VW Shanghai
12.2019
Engine research and development factory
5,000 m² Type 2-600 and type 6 N32 with alu checker plate covering
Project report
5,000 m² Type 2-600 and type 6 N32 with alu checker plate covering
Project report
ERBER Group Campus 1
02.2019
Corporate Headquarters
6,600 m² Type 6 Calcium sulfate
350 m² Combi T
210 m² Combi T Aqua
150 m² Heavy duty floor Type 2
Project report
6,600 m² Type 6 Calcium sulfate
350 m² Combi T
210 m² Combi T Aqua
150 m² Heavy duty floor Type 2
Project report
Hana Bank
12.2018
Office building
28.800 m² access floor Type 6 calcium sulfate with oak-wood parquet
2.400 m² access floor Type 6 calcium sulfate with walnut-wood parquet
2.400 m² access floor Type 6...
28.800 m² access floor Type 6 calcium sulfate with oak-wood parquet
2.400 m² access floor Type 6 calcium sulfate with walnut-wood parquet
2.400 m² access floor Type 6...