China Construction Bank Beijing Data Center

Location:

Beijing, China

Building owner

CCB China

General contractor

Tongfang Co., Ltd.

Architect:

China Architecture Design Group/HP Group

Completion:

2016

Floor systems

20.000 sqm type 6 with HPL covering

China Construction Bank Headquarters Beijing data center has over 140.000 sqm of floor area with a total investment of 500 Million Euro, which will undertake the responsibility for a bank data background processing. It will become the largest T4 data center all over Asian area.

The project is designed by HP and China Architecture Design Group as the most modern and energy efficient IDC in China. The data center is elected as the first LEED (silver) datacenter project in China by using more eco-friendly materials.

MERO Type 6 calcium sulphate panels and Type 3 perforated steel panels with finished height of 800 mm have been installed in all the core equipment rooms, air condition room, aisle and control room to match the highly loading capacity requirements.

Contact us

Get in touch with us

MERO-TSK International GmbH & Co KG
Max-Mengeringhausen-Straße 5
DE – 97084 Würzburg
Tel.: +49 (0) 931 6670 – 0
Fax: +49 (0) 931 6670 – 409
E-Mail: info@mero.de

Contact us