6.600 m² Type 6 Calcium sulfate
350 m² Combi T
210 m² Combi T Aqua
150 m² Heavy duty floor Type 2
New building ERBER Campus 1, 3131 Getzersdorf, Austria
As a company group being active in more than 120 countries in the scope of food safety, the Erber Group clearly admits to its Austrian origin.
The newly built corporate headquarters at Getzersdorf (Lower Austria) includes more than 11,000 m² of state-of-the-art office areas.
In the coming years the campus is supposed to become a working place for more than 450 people from all over the world.
The building is the first building ever to be certified as LEED Platinum in Austria.
MERO Flooring systems:
Concretely installed is 350 m² of standard hollow floor MERO Combi T with a point load of 3 kN, as well as 210 m² of MERO Combi T Aqua, suitable for wet areas.
At the classic office areas 6,600 m² of MERO raised access floor type 6 of calcium sulfate panels with a point load of 3 kN are installed.
At the switch rooms some 150 m² with considerably stronger MERO Heavy duty systems type 2 are in-stalled.