Wet Hollow Floor
Combi A - 35 AEV–3
Access Floor
Type 6 N36 with Linoleum
The Aurelis Objektgesellschaften constructed these innovative office buildings at Duisburg Central Station in cooperation with our client, Hochtief Infrastructure GmbH, Building NRW in Düsseldorf. In total, the approx. 16,400 sqm of hollow and raised floors are spread over these two buildings on the ground floor – 6th floor in MK04 and floors 1 – 5 in MK08.
For the DGNB “Gold” certification of both buildings, particular attention was paid to the selection of ecological and sustainable building materials for the interior fittings.