Stadtwerke München SWZ BT Q

Location:

München, Deutschland

Building owner

Stadtwerke München GmbH

Architect:

Büro Fritsch + Tschaidse, Munich

Completion:

2020

Floor systems

Office areas
Type 6 N36 Raised
Access Floor, 3 kN, covering Needlefelt,
app. 3500 m²
IT-areas
Type 2-600S/ 6 NB38-6200
Switchgear Floor, 10 kN, covering
Rubber, app. 320 m²
Control room
Type 3 Silent 32-RR30-3
αw= 0.75 (MH) on top of Type 2-600
Switchgear substructure, rising in 4 levels,
5 kN, covering Needlefelt, app. 800 m²

Client and planner put special emphasis on flexibility for this project, thus all floors are executed as Raised Access Floors. With this you can access the installation area at any point on the floor with a single grip.

The whole office area is executed with an incombustible Raised Access Floor with a factory applied Needlefelt covering. The Raised Access Floors of the IT areas are able to bear single loads up to one ton and are completed with integrated frame substructures. For ventilation / cooling of the rooms, perforated steel panels with 51 % free airflow are used.

The 24-hour control room is the centerpiece of the project. Workstations are staggered in four levels (550, 735, 915 and 1095 mm from raw floor) and barrier-free connected via ramps and a scissor lift. To ensure an undisturbed working environment, the building acoustics engineer required a sound absorption level αw ≥ 0.65. Our installed “Silent” panels significantly outperform this value with αw = 0.8 (L) and still fulfil the requested point load of 5 kN.

Contact us

Get in touch with us

MERO-TSK International GmbH & Co KG
Max-Mengeringhausen-Straße 5
DE – 97084 Würzburg
Tel.: +49 (0) 931 6670 – 0
Fax: +49 (0) 931 6670 – 409
E-Mail: info@mero.de

Contact us