MERO TSK - Systems "Made in Germany"

References

project report

Warsaw Unit

Location:

Warsaw, Poland

Building owner

Ghelamco Poland

General contractor

Ghelamco Poland

Architect:

Projekt Polsko-Belgijska Pracownia Architektury

MERO-TSK Partner

MERO, Polska

Completion:

2023

Floor systems

50.000 m2 access floor type 5GBB30
7.000 m2 hollow floor type Combi-T36

The building has 46 floors, 14 elevators, 57,000 m² of office and commercial space and 456 parking spaces. The first floor of the building will house service and catering spaces as well as a three- level underground parking garage. The parking lot extends over 8 levels above ground. The skyscraper is equipped with 14 elevators, including some with panoramic views.

A Dragon Skin facade was used for the Warsaw section. A kinetic facade consisting of several thousand moving tiles that reacts to gusts of wind and thereby creates unique images. This type of facade was realized for the first time in Poland. On the top floor of the skyscraper is a terrace surrounded by a glass wall.

Contact us

Get in touch with us

MERO-TSK International GmbH & Co KG
Max-Mengeringhausen-Straße 5
DE – 97084 Würzburg
Tel.: +49 (0) 931 6670 – 0
Fax: +49 (0) 931 6670 – 409
E-Mail: info@mero.de

Contact us