Munich Airport - Terminal 2

  • Location: Munich, Germany
  • Architects: Koch und Partner, Munich
  • Completion: 2002
  • Client: Terminal 2 Immobilien-Verwaltungsgesellschaft mbH Flughafen München, Baugesellschaft mbH, München
  • Scope of Work: Steel Substructure and Double Glazed Façade
  • Cladding: approx. 12.000 sqm double façade with 23.100 sqm tempered safety glass, laminated glass and insulated glass
  • Type of Stucture: Post mullion structure

After a construction time of more than two years, the second terminal of Munich Airport was completed. and opened in spring 2003.
Terminal 2  will double the passenger capacity of Munich Airport to 25 million per year.

The double glazed façade constructed by MERO as a structure of ladders with connecting trusses has a total surface of approx. 12.000 sqm. The rectangular hollow sections of the façade substructure carry the glass panels and sealing profiles.

logo
Max-Mengeringhausen-Straße 5
97084 Würzburg, Germany

subnav map

Contact

+49 (0) 931 6670-0

 +49 (0) 931 6670-409

  info@mero.de

Cookie Configuration